BWC has played a significant role in assisting Main Roads WA with their revegetation of road construction zones. Aiming to re-establish the vegetation to maintain the environmental value of the roads, BWC is proud to have played a part in this Main Roads project. The types of revegetation for the projects in East Perth include ripping, mulching, tube stock planting, and watering-in.
During this project, BWC was involved in:
- Wet hire of equipment to assist with the revegetation of the East Perth redevelopment area
- Working with road closures and traffic management crews
- Ongoing and various other works from 2017 to present